Ceramsite Panel On Site Dry Installation Step By Step Guide

The dry installation construction method of Ceramsite Panel Expanded Clay Cement Panel is the core reason why its construction speed is much faster than traditional wet mortar wall construction. As long as you follow this standard step by step installation guide, even a small team of two workers can easily complete the whole wall construction work with very high quality. The first step is the on site preparation and measurement. First you need to clean the floor and the top floor slab of the installation position, then use a laser level and ink line box to pop out the accurate position line of the partition wall on the floor, wall and top slab. Mark the position of each standard Ceramsite Panel according to the design size. The second step is to install the fixed top and bottom U shaped keels. Use the impact drill to drill holes on the floor and top slab along the marked line, then fix the U shaped special galvanized keel on the ground and top with expansion screws. The spacing between each expansion screw should not exceed 60 centimeters. The third step is to place the Ceramsite Panel into the keel in sequence. First apply a layer of special matching adhesive on the side of the panel, then insert the bottom of the panel into the U shaped keel on the ground, push the panel to the vertical position, then adjust the panel to be completely vertical with a level ruler. Then fix the top of the panel into the upper U shaped keel with special self tapping screws. The fourth step is the seam treatment. After all panels are installed, fill the gaps between panels with special anti cracking putty, then paste a layer of anti cracking fiber mesh belt on all the panel seams. This can completely prevent the wall seam from cracking after long term use. The fifth step is the basic surface treatment. After the putty is completely dry, you can do simple polishing on the wall surface. At this time, the whole partition wall is completely completed. The whole process does not need any traditional mortar mixing work. A 100 square meters partition wall can be fully installed in one day. This standard installation process can ensure that the Expanded Clay Cement Panel wall is firm durable and will not have quality problems for more than 50 years.

Leave a Comment

Scroll to Top